Capitol Crossing

Lasa marble for the currently most modern building complex in the capital of the USA

In 2017 and 2018, the first buildings were constructed in the heart of the U.S. capital, Washington D.C. in a newly constructed street block consisting of a total of five multi-storey buildings with offices, numerous shops and restaurants on the ground floor. On a total area of around 204,400 m2, the building complexes, which are known as Capitol Crossing in their entirety, will be erected by spring 2020 on behalf of Property Group Partners and according to plans drawn up by Kevin Roche John Dinkeloo and Associates. Lasa Marmo supplied a total of 1,000 square metres of LASA BIANCO ORTLES® and LASA BIANCO NUVOLATO® for the wall cladding of the entrance areas of two completed buildings, "200 Massachusetts Avenue" and "250 Massachusetts Avenue North".

Project Information

Washington DC, USA, 2017-2020

Product:Wall cladding 2 cm and 3 cm
Volume:1000 m2
Surface:Honed
Architect:Roche Dinkeloo
Photos:Jim Tetro
Medialink:THE PLAN 2020

LASA Bianco Ortles™®LASA Bianco Nuvolato™®